Building Project Value (no trade values)
Amendment Building Value (no trade values)
Mechanical Project Value
Amendment Mechanical Value
Electrical Project Value
Amendment Electrical Value
Plumbing Project Value
Amendment Plumbing Value
Demolition Project Value
Amendment Demolition Value
Tank - Removal or Installation
Commercial Kitchen Hood - Type 1 only
Electric/Plug-In Vehicle Charger
Fire Protection Permit Fees -Does not include Fire Line to Building or Utility Dept Tap Fee
Fire Line to Building - Does not include Utility Department Tap Fee
Permit Amendment Fee
Residential Electrical Repairs less than $1000
Code Modification Fee
Code Modification Fee
Issue C of O - With No Active Permit
Issue C of O - With No Active Permit
Amusement Device-Circular or Flat Ride
Amusement Device-Kiddie or Inflatable
Amusement Device - Spectacular Ride
Amusement Device - Coaster over 30'
Manufactured Trailer Change-out Single or Double wide Fee
Temporary Construction Office Trailer
Occupant Load Signs-Single Exit Spaces
Occupant Load Signs-All Other Spaces
Blasting Permit Fee - Special Use Permit
Permitting Fees (from above -Including trades)
Virginia State Levy Fee 2% of Permit Fee